WORK PROGRESS REPORT FOR PROPOSED ‘DEIRA HEIGHTS’ RESIDENTIAL DEVELOPMENT ON LR NO 209/104/8 PARKLANDS NAIROBI AS AT 06.08.2018
The project is on track as per works schedule. Currently the reinforced concrete structure is at level 03 of 18 (basement, ground floor and first floor parkings done) Level 4 slab and columns are ongoing, at an advanced stage.